Cabbage Stacks at Slater
A Short Illustrated History of the
The Dowling and Camp Lumber Company's
Sawmill at Slater, Florida.
By Donald R Hensley, Jr.
with a lot of help from Willie Grant and the late Earnest "Frog" Smith".
Photos from Donald R. Hensley, Jr. collection unless noted otherwised.
Copyright 2003 by Donald R. Hensley, Jr.
Dowling & Camp number 1 somewhere out on the logging line near
Labelle, Florida.
Note the loader in the background.
The Slater sawmill and company town
was originaly built by the J.W. McWilliams Company, Inc. of Ft. Myers
around 1924 and was named for a close friend of McWilliams. The sawmill
and town was built on the Atlantic Coast Line tracks across the
river north from Ft. Myers thei logging line was built west towards the
coast, crossing the Seaboard Air Line tracks. When McWilliams logged
out around 1929 he sold the mill to the Dowling Lumber co. which
had just closed their Odessa Mill. William H. and James H. Dowling
brought on board Vaughn Camp as a partner and they operated the Slater
mill as the Dowling and Camp Lumber Co.
D&C 103 drinking swamp water on a trestle.
The
Dowling and Camp Lumber Co. soon purchased a tracton the east side of
Labelle and arranged for trackage rights over the Seaboard thru Ft.
Myers to Labelle, where Dowling and Camp logging trackage ran southeast
into the Piney woods. Dowling and Camp used locomotives numbers
103, 170 and later on numbers 10 and 44 as mainline loggers that had to
be ICC and Seaboard Certified. The empty log train left the mill
about noon time, heading west to the Seaboard crossing a few miles
away. The D&C tracks crossed the Seaboard tracks at Salvista
(sometimes known as Tamiami City) with a backing move wye. The
North wye track was used for interchange, while the south wye was used
for running towards Ft. Myers. The empties would run across the river
to East Ft. Myers where the interlocking for the Labelle Branch was
located. Here the train man was locked in the building until all the
switches were realigned for the mainline. The train would then proceed
to the Labelle camp where they would drop off the empties and pick up
yesterday's loads, returning to Slater that evening, unloading the next
morning before starting the cycle again.
D&C 14, a lovely 1911Vulcan 2-6-0 at the shops at Slater.
Photographed on April 10, 1941 by George Pettingill.
The
Dowling & Camp's logging camp near Labelle was the center of
logging operations southeast of Labelle. Here the logging mainline
travelled as far east as Atlantic Coast Line's Imokolee Branch and may
have crossed that branch. The logging locomotives such as D&C 1,3,12
and 14 would take over the empties from the mainline
locomotives and haul the trains out over the light logging spurs.
D&C # 2 was the regular mill switcher. Claude Page is the
engineer here.
Photographed at Slater on July 13, 1938 by George Pettingill.
In the 1940's Earnest "Frog" Smith was the regular engineer of
the 2 spot.
This little Baldwin Prairie was built in 1920 and was sold to the Lee
Tidewater Lbr Co.
and survives to this day at the museum down in Naples.
After
the Labelle tract was logged out the company moved the camp near Alva
and ran a new logging mainline south. Here the schedule of the mainline
trains changed because the distances were shorter. The mainline empty
train left the mill early in the morning and return early enough in the
afternoon to unload before nightfall.
A load of lumber being hauled to
the Seaboard interchange by a double header train, 103 and 10.
William
Dowling died in 1941, leaving his widow, Hallie Dowling in
charge. Negotiations on a new timber tract broke down soon after and
the Dowling and Camp Lumber Co. soon ran out of Pine to cut. The last
tree was sawned in 1944. The locomotives and equipment was dispersed or
scrapped, some went futher south to the Lee Todewater Cypress Co.
Cypress operations in Copeland or the C.J. Jones Lbr Co. Yellow Pine
logging at Jerome, Florida.
Another cute little Vulcan,
the three spot was a rare modern day 2-4-0 built by Vulcan in 1915!
Here she was photographed at Slater on March 7, 1936 by George
Pettingill.
Click here for more photos.
Click here for the locomotive roster.
Click here to return to Tap Lines Index.